Catch the missing record at the weld — not at handover.

For welding, piping, mechanical and maintenance contractors working on pipelines, tanks, refineries and process plant — where every joint, test and hold point needs a record the operator will accept before you get paid.

Welding & fabricationPiping & mechanicalTanks & structural steelShutdowns & maintenance

Sound familiar?

01

Hold points that weren't witnessed

Work moves past an inspection point and nobody catches it until closeout, when putting it right means undoing finished work.

02

Traceability scattered across parties

Radiography reports, procedures and welder qualifications sit with different subcontractors and labs. Tying them back to the right joint is manual, slow and easy to get wrong.

03

The pack gets rebuilt by hand

Photos off phones, certificates out of inboxes, days of collation before anything can be submitted or invoiced.

04

Rework you find too late

A wrong component or an out-of-sequence step gets covered by the next stage, and surfaces when it's most expensive to fix.

The work becomes the record.

Validated at the work faceThe evidence each inspection step requires is checked while the crew is still there, not after they've demobilised.
Traceability that assembles itselfEvery photo, test record and sign-off tied to the joint, the asset and the inspection step it belongs to.
Test and handover packs, generatedThe pack builds as the work progresses, in the shape the operator expects — ready to send, not rebuild.

See it on your next test pack.